Skip to main content

Murray-West Industrial Park

Located adjacent to U.S. Highway 641, the Murray West Industrial Park has pad-ready sites available for buildings up to 500,000 square feet. All utilities are in place and there are no floodplain or wetland issues for the property.

General Information

State:
Kentucky
County:
Calloway
City:
Murray
Location:
36 39’N 88 18’W
Elevation:
513’+
Total Acreage:
134
Available Acreage:
78
Zoning:
Industrial
Price per acre:
Negotiable dependent upon investment and jobs

Ownership


Contact

Mark Manning, President

markmanning@thinkmurray.com

270-762-3789

270-752-7521

270-762-4180

Murray-Calloway County Economic Development Corporation
PO Box 1476
926 North 16th Street, Suite 110
Murray, KY 42071, USA

Murray-West Industrial Park Reports


In this section you will find details including a rendering of the park as planned, final topo, utility layout and electrical feed, as well as soils reports and full environmental review documents.
 Final Topographical  (PDF 1.1 MB)

 Utilities  (PDF 883 kb)

 Electrical Feed  (PDF 278 kb)
 Soils Report  (PDF 1.8 MB)


Transportation

Highway

Adjacent to U.S. 641N with 4 lane limited access to I-24 and I-69. Distance to I-69 is 14 miles with distance to I-24 being 34 miles east and 24 miles to the north.

Air

Nashville International Airport (BNA) is located 124 miles from Murray-West via 4 lane limited access and interstate. The airport serves 520 flights per day and is served by 16 major airlines.

Barkley Regional Airport (PAH) is located 46 miles from Murray and has twice daily flights to and from Chicago O’Hare airport via commuter jets with United Express.

Kyle-Oakley Field (CEY) is located less than 5 miles from Murray – West industrial Park and is ideal for Corporate Jets and private service. With a runway of 6,200’ Jet A fuel and new terminal, Kyle Oakley regularly services aircraft from the smallest single engine to large Corporate Jets.

Riverport

The Paducah – McCracken Riverport is located 37 miles from Murray – West Industrial Park.

Rail

Murray – West industrial Park is not served by rail.

Utilities

Electrical Service

Provided by TVA generation distributed by West Kentucky Rural Electric. The site is fed by dual substations with automatic switching and approximately 50 MVA excess capacity

Natural Gas

Distributed via the City of Murray’s 6” high pressure line with 4” service on site. The City system is fed by Interstate transmission lines operated by Texas Gas and ANR thus ensuring high reliability and cost competitiveness.

Water

Also provided by the City of Murray with a 12” line on site as well as a 500,000 gallon elevated storage tank. Excess capacity is over 3.5mm gpd.

Wastewater

Provided by the City of Murray with an 8” gravity flow line on site. Currently, excess capacity is about 1.0mm gpd but will soon increase dramatically with completion of a new treatment facility.

Broadband

Served primarily by Murray Electric Company with speeds available up to 1 GBps. AT&T and others are available as well.